Lakewood Bungalow
- 3,364 Sqft
- 4 Beds
- 3 Baths
- 817 Sqft
- ICF foundation
- ICE Panel walls above grade
Open House Showcasing the ICE Panel system
Custom Floorplan
Close ExpandThe home features 4 bedrooms, 3 bathrooms, and a walkthrough pantry, totaling 3,364 square feet of living space. It also includes an attached 817 square foot garage. Throughout the home, custom Craftsman-style interior window trim adds a touch of elegance and character, elevating the overall design aesthetic. A spacious front entry welcomes guests, providing a grand entrance to the home while offering a warm and inviting atmosphere. Additionally, the home is built with an ICF (Insulated Concrete Form) foundation and ICE (Insulated Composite Envelope) Panels above grade, ensuring superior energy efficiency and comfort, contributing to both sustainability and cost savings in the long run.
The stairs leading to the basement are designed for ease of use and safety, well-lit by natural light streaming in through strategically placed windows. In the basement, a tray ceiling adds architectural interest and sophistication to the space.
The functional floorplan enhances everyday living, with thoughtful design elements such as the garage-mudroom entrance and main floor laundry adding convenience and efficiency to daily routines. Each aspect of the home is carefully crafted to maximize both style and usability, resulting in a harmonious blend of comfort and practicality. From the spacious great room to the innovative use of space in the basement, the Lakewood Bungalow offers a perfect balance of form and function for modern living.
Public Open House Dates
Close ExpandOn October 2nd, 2022, we held a public open house to showcase the ICF (Insulated Concrete Form) foundation and ICE (Insulated Composite Envelope) Panel wall construction. At that stage, the interior framing was complete, along with HVAC and electrical rough-ins, and window and door installations.
Another open house was held on February 18th and 19th, 2023, to showcase the home before the owners moved in. Afterward, the finishing touches were completed, and the owners took possession on February 24th, nearly a month ahead of the original schedule.